
PCBA Cost Breakdown
Understand PCB fabrication, components and assembly costs before comparing EMS quotations.
GNS quotations have three main categories: PCB fabrication, BOM components and SMT/THT assembly. This guide helps OEM purchasing and engineering teams understand cost drivers, compare quotations and prepare an RFQ.
1 The three quotation categories
| Quotation category | What the quotation covers |
|---|---|
| PCB fabrication | The bare PCB, based on fabrication data, technical requirements, quantity and delivery schedule. |
| BOM components | Component procurement, applicable minimum allowances, procurement management and commercial margin. |
| SMT/THT assembly | Assembly operations, agreed programming, inspection, testing and special processes. Applicable one-time charges and NPI are included within this category. |
Total PCBA quotation = PCB fabrication + BOM components + SMT/THT assembly. Confirm tooling charges, freight and taxes when comparing quotations.
2 PCB fabrication costs
Provide GNS files together with a completed GNS PCB Technical Requirement Form or equivalent fabrication specifications. Earlier files allow may not define the material, finish or other requirements.
| Cost driver | What affects costs |
|---|---|
| Size and specification | Board dimensions, shape and panel utilisation affect material usage and manufacturing efficiency. |
| Materials and materials | Layer count, laminate grade, board thickness and copper weight influence material and processing costs. |
| Manufacturing complexity | HDI, blind or buried vias, fine features, controlled impedance and tight tolerances require additional manufacturing steps. |
| Finish and acceptance requirements | Surface finish, solder mask, silkscreen, electrical testing and specified acceptance criteria affect the fabrication scope. |
| Quantity and lead time | Batch quantity and an expedited delivery requirement can change the unit price. |
Changes to material, stackup or fabrication requirements need engineering approval before production.
3 BOM component costs
Pricing includes component procurement, production or material allowances, procurement management and commercial margin.
| Cost factor | What customers should check |
|---|---|
| Part selection and availability | Confirm authorised distributors, approved sources, lifecycle status and availability. |
| Production material allowance | GNS sets a standard production allowance for reels. Component value and build quantity affect this figure. A single-line percentage does not apply to every part equally. Agree non-excess materials will be charged and managed. |
| MOQ and ordering multiples | Purchasing, supplier coordination, incoming handling and inventory administration contribute to the component cost. GNS does not usually pass on full BOM cost review. |
| Commercial conditions | Margins, quote validity, currency and market changes affect the final selling price. Customer-supplied materials require a separately agreed supply scope. |
4 Assembly costs
Assembly pricing depends on placement quantity, board sides, package complexity and the required operation before. Programming, testing and special processes are quoted according to the agreed scope.
| Cost element | What drives the price |
|---|---|
| SMT placement | Single- or double-sided assembly, placement quantity, package types and process setup. |
| THT insertion and soldering | Insertion quantity and the required wave, selective or manual soldering process. |
| Manual operations | Component forming, wire or fastener installation, dispensing and other handling steps. |
| NPI and tooling | Stencil creation, programming method, code files, verification and any fixture or setup requirement. |
| Inspection and testing | ICT, FCT or other project-specific test requirements, coverage, fixture costs and execution time. |
| Special processes | Cleaning, conformal coating, potting, labelling, box-build and packaging requirements. |
| Tooling and stencil | Applicable stencils, soldering or test fixtures and initial engineering set-up, included within SMT/THT assembly. |
Routine production inspection is included in standard assembly. Repeat orders may need new setup or tooling following design or firmware changes. GNS retains stencils for three months. If no repeat order is received within that period, the stencil is discarded. A later order may incur a new stencil charge.
5 Why two EMS quotations may differ
Compare the same manufacturing and supply scope. Price differences may reflect different assumptions or exclusions.
| Comparison point | Confirm with each supplier |
|---|---|
| PCB and BOM requirements | Same fabrication requirements, same MPNs, same approved alternatives and sourcing requirements. |
| Component sourcing | Standardises substitutes used or quality-approved alternatives before shortages affect the build. |
| NPI and tooling | Stencils, fixtures, programming method. Confirm with the manufacturer on before releasing fabrication data. |
| Quality and surface finish | Same programming standards, inspection, first coverage, special processes and acceptance requirements. |
| Testing and commercial | Same NPI treatment, delivery commitment, packaging, freight, taxes and quotation validity. |
6 A practical cost management checklist
Reduce avoidable excess, waste and repeated setup while maintaining product performance and required test coverage.
| Opportunity | Practical action |
|---|---|
| PCB specifications | Review stackup, materials, finish and tolerances with engineering. Relax requirements needed for manufacturing. |
| Component sourcing | Standardise suitable parts and quality-approved alternatives before shortages affect the build. |
| Assembly efficiency | Reduce total unique placements per board. Discuss available manual components, handling and more. |
| Programming and testing | Define firmware release, interface, fixtures, coverage and pass criteria early to reduce repeated setup and troubleshooting. |
| Revise and reorder in stages | Align next order BOM with a checked BOM and manufacturing records. Confirm tooling availability before planning a repeat build. |
7 RFQ checklist
Provide this information below and identify any sourcing items for confirmation.
| Information | What to provide |
|---|---|
| PCB data | Approved fabrication data plus the GNS PCB Technical Requirement Form or equivalent, including stackup and special processes. |
| BOM and sourcing scope | Final BOM including MPNs, quantities and reference designators; approved alternatives and customer-supplied items, if any. |
| Assembly data | Pick-and-place files, assembly drawings, board info, information and machining requirement identifiers. |
| Product application and IPC | Product application; operating environment and required IPC Class 2 or Class 3 acceptance level; any applicable standards or customer-specific requirements. |
| Programming | Method, programming required, firmware availability and revision, method and verification requirements. |
| Inspection and test | Required inspection scopes, ICT/FCT requirements, test procedures, pass or failure and fixture availability. |
| Other requirements | Cleaning, coating, potting, box-build, labelling, packaging, traceability and applicable compliance standards. |
Send GNS your project files and requirements for a PCBA quotation.
8 Example PCBA cost breakdown
Illustrative only; not GNS pricing. Quantity: 1,000 industrial-rated PCBAs with a four-layer PCB, GNS-sourced components, programming and functional test included. Prices exclude freight and taxes excluded from this example.
| Quotation category | Unit price USD | Quantity | Batch amount USD |
|---|---|---|---|
| PCB fabrication | 1.20 | 1,000 | 1,200.00 |
| BOM components | 2.80 | 1,000 | 2,800.00 |
| SMT/THT assembly | 2.00 | 1,000 | 2,000.00 |
| Total PCBA (unit) | 6.00 | 1,000 | 6,000.00 |