Global PCBA Manufacturing & Component Sourcing

BOM Template for PCBA Quotation

BOM Template for PCBA Quotation

A clear Bill of Materials helps GNS identify components, prepare quotations and clarify sourcing requirements. Use the GNS BOM template or submit your existing format.
For each populated component, provide the manufacturer, full manufacturer part number, quantity per PCBA and reference designators.

Project Information

InformationWhat to provide
Company and projectCustomer name and project or product name
PCB part numberBoard identifier used in your design files
PCB revisionRevision of the PCB being quoted
BOM revisionRevision of the submitted component list
Quotation quantityNumber of assembled boards required
Prepared by and dateContact person and document date

If the product has multiple assembly variants, identify the variant covered by each BOM.

BOM Fields

Use one row for each unique component specification. Group reference designators only when they use the same component and sourcing requirements.

FieldWhat to enterExample
Item No.Unique line number1
Reference DesignatorsAll PCB positions using this componentR1, R2, R3
Quantity / PCBANumber installed on one assembled board3
DNP?Yes for components that must not be populatedNo
Component Description / ValueComponent type and key specifications10 kΩ, ±1%, resistor
ManufacturerOriginal component manufacturer—
Manufacturer Part NumberFull orderable MPN, including relevant suffixesRC0603FR-0710KL
Package / FootprintComponent package or footprint designation0603
Customer Approved Alternate MPNAlternative approved by your engineering teamFull alternate MPN
Alternate ManufacturerManufacturer of the approved alternativeManufacturer name
Substitution PolicyPermitted approach to substitutionApproval Required
Customer Supplied?Yes only when you supply the componentBlank / No
Special Requirements / NotesSourcing, handling or assembly requirementsProgramming required

GNS Review Status, where shown in the downloadable workbook, is completed by GNS.

Component Sourcing and Substitutions

GNS will source components unless Customer Supplied? is marked Yes. Blank or No means GNS sourcing.

Substitution policyMeaning
Exact MPN OnlyNo substitutes permitted
Approved Alternates OnlyOnly customer-approved alternatives listed in the BOM may be used
Approval RequiredGNS may propose alternatives; customer approval is required before procurement or use
BlankGNS quotes the specified MPN and requests approval before any substitution

Use Notes for additional restrictions, such as approved brands, electrical limits or qualification requirements. A similar description or matching footprint alone does not establish component equivalence.

Example BOM Entries

These entries illustrate the format. Confirm part numbers against your approved design before submission.

Ref.QtyDNP?DescriptionManufacturer and MPN
R1, R2, R33No10 kΩ, ±1% resistor, 0603Yageo RC0603FR-0710KL
C1, C22No100 nF, 50 V, X7R capacitor, 0603Murata GRM188R71H104KA93D
R990YesOptional resistor, not populated—

Keep DNP positions visible in the BOM and enter 0 as the installed quantity.

Before Submitting Your BOM

CheckWhat to confirm
Part identificationManufacturer names and complete MPNs are provided
Quantity and positionsQuantities match the listed reference designators
Document revisionsBOM, PCB and placement files cover the intended build
AlternativesApproved alternatives and substitution permissions are clear
Customer supplied partsConsigned components are marked Yes
Special requirementsProgramming, handling and other restrictions are recorded

Submit the BOM with relevant Gerber files, assembly drawings and pick-and-place files. Discuss target pricing and delivery requirements separately from the component list. Already have a BOM in your own format? Send it with your project files. GNS will review the information and clarify any missing details.